Document:
Phase 2b factsheet: Control of noise from the operation of stationary systems
This factsheet explains the measures that are expected to be put in place to control the effects of noise from the operation of stationary systems designed and installed by the nominated undertaker as part of the Proposed Scheme.
Document history
- Published:
- 4 June 2018
- Updated:
- 24 September 2020