Skip to main page content

View document history

Document:

Phase 2b factsheet: Land drainage

Approach taken to land drainage issues during the preliminary design of the Proposed Scheme and the further measures to be taken during detailed design, construction and operation.


Document history

Published:
10 October 2018
Updated:
24 September 2020