Skip to main page content

Search Results 321

Sort Results by:

  1. Amersham Headhouse

    10th August 2021

    HS2 has updated designs for the Amersham Headhouse – one of five structures that will be built to provide ventilation and emergency access to the high-speed rail line’s 10 mile-long Chiltern tunnel.

  2. Chalfont St Giles Headhouse

    10th August 2021

    The Chalfont St Giles Headhouse is the second of four structures that will be built to provide ventilation and emergency access to the high-speed rail line’s 16Km (10 miles) long Chiltern tunnel.

  3. HS2 in Northamptonshire

    20th May 2021

    Find information about planned HS2 works, activities and events taking place in the Northamptonshire area.

  4. Streethay Overbridge

    10th May 2023

    Streethay Overbridge is one of three bridges that will enable HS2 to pass beneath the A38 Rykneld Street, A38 Southbound Slip Road, and the South Staffordshire Line (SSL).

  5. Euston Cavern Headhouse

    3rd May 2023

    The Adelaide Road Headhouse is located between Chalk Farm Road and Primrose Hill Road on the Network Rail embankment area.

  6. Chalfont St Peter Headhouse

    10th August 2021

    Align is working on behalf of HS2 Ltd to build 22km (13.5 miles) of the high speed rail line, running between the Colne Valley and the Chilterns.

  7. Euston Portal Headhouse

    3rd May 2023

    Euston Portal Headhouse and Ventilation Shaft sit on top of the concrete box, where the tunnels connect to the box south of Mornington Street bridge.

  8. Colne Valley Viaduct

    25th August 2021

    We are building a new 3.4km viaduct crossing the Colne Valley

  9. Old Curzon Street Station building

    25th June 2021

    The site will once again be at the heart of the rail network within the new Birmingham Curzon Street Station complex.