Search Results 280
Sort Results by:
- Date
- Relevance
-
About us
20th October 2020
HS2 Ltd is developing and promoting the UK's new high speed railway network
-
Environmental facts
31st October 2020
Find out how HS2 is protecting and enhancing the woodlands, habitats and wildlife, as we plan and build a climate-resilient railway.
-
Responsible business and communities
13th February 2019
Every community should have the opportunity to thrive.
-
HS2 in Brent and Ealing
20th May 2021
Find information about planned HS2 works, activities and events taking place in the Brent and Ealing area.
-
Crewe to Manchester (Phase 2b – Western Leg)
9th August 2022
The extension of the high speed network to Manchester will free up capacity on the congested West Coast Main Line and deliver significant connectivity, reliability and journey time benefits for passengers.
-
Mandeville Road Headhouse
11th August 2021
SCS JV will build a ventilation shaft and headhouse at the Mandeville Road Works site.
-
Long Itchington Wood Tunnel
2nd March 2021
Long Itchington Wood Tunnel is a 1.6km (1 mile), twin bore tunnel on the new high speed railway in Warwickshire.
-
Chiltern Tunnel
25th June 2021
The Chiltern Tunnel is the longest tunnel on the HS2 route between London and Crewe. The twin-bore tunnel is 16km (10 miles) long and will carry passengers under the Chiltern Hills.
Water Orton Viaducts
25th June 2021
The Water Orton Viaducts will be made up of two viaducts which will hold 700 metres of new HS2 track above the River Tame and M42.
-
Wellwick Farm
11th July 2020
A wealth of archaeology finds have been revealed by HS2 archaeological work at Wellwick Farm, near Wendover on the HS2 line of route.