Search Results 264
Sort Results by:
- Date
- Relevance
HS2 Sustainability Approach
19th January 2021
Approach to sustainability across the environment, economy and society.
SSHELT working group: people and vehicle interface off site
11th October 2018
Explains our approach to manage the risk of construction traffic.
Phase 2b factsheet: Hybrid Bill process
7th October 2020
Outlines what a hybrid Bill is, why the Secretary of State intends to introduce a hybrid Bill for HS2 Phase 2b and the process a hybrid Bill must follow in Parliament before it receives Royal Assent.
Phase 2b factsheet: Worksite security
7th October 2020
Outline the proposals for worksite security during construction of the Proposed Scheme.
Phase 2b factsheet: Air quality
7th October 2020
Outlines how the potential air quality impacts of the Proposed Scheme will be managed.
Phase 2b factsheet: Approach to sustainability
7th October 2020
Outlines HS2 Ltd's approach to sustainability.
Phase 2b factsheet: Balancing ponds and replacement flood storage areas
7th October 2020
Outlines the approach and background to balancing ponds and replacement flood storage areas, which will be used to mitigate the impact on water resources and flood risk of the Proposed Scheme.
Phase 2b factsheet: Private means of access
7th October 2020
Outlines how the permanent effects of the Proposed Scheme on private means of access would be managed.
Phase 2b factsheet: Roads and public rights of way
7th October 2020
Outlines how the effects of the Proposed Scheme on roads and public rights of way (PRoW) along the line of route would be managed.
Phase 2b factsheet: Land drainage
7th October 2020
Approach taken to land drainage issues during the preliminary design of the Proposed Scheme and the further measures to be taken during detailed design, construction and operation.