Search Results 280
Sort Results by:
- Date
- Relevance
-
About us
20th October 2020
HS2 Ltd is developing and promoting the UK's new high speed railway network
Sustainability Policy
13th October 2020
HS2 has a Sustainability policy which sets out our ambition to build the most sustainable high-speed railway of its kind in the world.
-
Contact us
12th October 2020
Find out how to contact HS2 Ltd about: general, media and career enquiries, FOI requests, complaints and small claims.
Phase 2b factsheet: Burial grounds
7th October 2020
Sets out the emerging proposals for assessing and reducing the impact on burial grounds that could result from the construction of the Proposed Scheme.
Phase 2b factsheet: Archaeology
7th October 2020
Looks at archaeological assets; the physical remains of past human activity, either above or (largely) below ground.
Phase 2b factsheet: Mitigation of significant community effects on public open space and community facilities
7th October 2020
This factsheet sets out the emerging proposals to mitigate the loss of public open space and community facilities
Phase 2b factsheet: Maintenance of landscaped areas
7th October 2020
This outlines outline emerging proposals for how the landscape areas created along the Proposed Scheme are expected to be maintained.
Phase 2b factsheet: Excavated material and waste management
7th October 2020
This factsheet sets out the objectives which are expected to be adopted and the measures that are expected to be put in place for managing excavated material and waste that may arise from the construction of the Proposed Scheme.
Phase 2b factsheet: Control of construction noise and vibration
7th October 2020
This factsheet outlines the objectives which are expected to be adopted and the measures that are expected to be put in place to control the effects of noise and vibration that might otherwise arise from the construction of the Proposed Scheme.
Phase 2b factsheet: Control of noise from the operation of stationary systems
7th October 2020
This factsheet explains the measures that are expected to be put in place to control the effects of noise from the operation of stationary systems designed and installed by the nominated undertaker as part of the Proposed Scheme.