    Phase 2b factsheet: Burial grounds

    7th October 2020

    Sets out the emerging proposals for assessing and reducing the impact on burial grounds that could result from the construction of the Proposed Scheme.

  2. Doc

    Phase 2b factsheet: Archaeology

    7th October 2020

    Looks at archaeological assets; the physical remains of past human activity, either above or (largely) below ground.

  3. Doc

    Phase 2b factsheet: Approach to sustainability

    7th October 2020

    Outlines HS2 Ltd's approach to sustainability.

  4. Doc

    Phase 2b factsheet: Mitigation of significant community effects on public open space and community facilities

    7th October 2020

    This factsheet sets out the emerging proposals to mitigate the loss of public open space and community facilities

  5. Doc

    Phase 2b factsheet: Balancing ponds and replacement flood storage areas

    7th October 2020

    Outlines the approach and background to balancing ponds and replacement flood storage areas, which will be used to mitigate the impact on water resources and flood risk of the Proposed Scheme.

  6. Doc

    Phase 2b factsheet: Maintenance of landscaped areas

    7th October 2020

    This outlines outline emerging proposals for how the landscape areas created along the Proposed Scheme are expected to be maintained.

  7. Doc

    Phase 2b factsheet: Soil handling and land restoration

    7th October 2020

    Outlines how HS2 Ltd intends to conserve soils displaced by the construction of Proposed Scheme and subsequently use them for the restoration of land for agriculture, forestry, landscape planting and ecological habitat creation and translocation.

  8. Doc

    Phase 2b factsheet: Land quality

    7th October 2020

    Outlines the expected approach to the assessment and treatment of contaminated land affected by the Proposed Scheme.

  9. Doc

    Phase 2b factsheet: Excavated material and waste management

    7th October 2020

    This factsheet sets out the objectives which are expected to be adopted and the measures that are expected to be put in place for managing excavated material and waste that may arise from the construction of the Proposed Scheme.

  10. Doc

    Phase 2b factsheet: Land drainage

    7th October 2020

    Approach taken to land drainage issues during the preliminary design of the Proposed Scheme and the further measures to be taken during detailed design, construction and operation.