Skip to main page content

Search Results 280

Sort Results by:

  1. South Portal Chiltern Tunnels

    About us

    20th October 2020

    HS2 Ltd is developing and promoting the UK's new high speed railway network

  2. Doc

    Sustainability Policy

    13th October 2020

    HS2 has a Sustainability policy which sets out our ambition to build the most sustainable high-speed railway of its kind in the world.

  3. Contact us

    12th October 2020

    Find out how to contact HS2 Ltd about: general, media and career enquiries, FOI requests, complaints and small claims.

  4. Doc

    Phase 2b factsheet: Burial grounds

    7th October 2020

    Sets out the emerging proposals for assessing and reducing the impact on burial grounds that could result from the construction of the Proposed Scheme.

  5. Doc

    Phase 2b factsheet: Archaeology

    7th October 2020

    Looks at archaeological assets; the physical remains of past human activity, either above or (largely) below ground.

  6. Doc

    Phase 2b factsheet: Mitigation of significant community effects on public open space and community facilities

    7th October 2020

    This factsheet sets out the emerging proposals to mitigate the loss of public open space and community facilities

  7. Doc

    Phase 2b factsheet: Maintenance of landscaped areas

    7th October 2020

    This outlines outline emerging proposals for how the landscape areas created along the Proposed Scheme are expected to be maintained.

  8. Doc

    Phase 2b factsheet: Excavated material and waste management

    7th October 2020

    This factsheet sets out the objectives which are expected to be adopted and the measures that are expected to be put in place for managing excavated material and waste that may arise from the construction of the Proposed Scheme.

  9. Doc

    Phase 2b factsheet: Control of construction noise and vibration

    7th October 2020

    This factsheet outlines the objectives which are expected to be adopted and the measures that are expected to be put in place to control the effects of noise and vibration that might otherwise arise from the construction of the Proposed Scheme.

  10. Doc

    Phase 2b factsheet: Control of noise from the operation of stationary systems

    7th October 2020

    This factsheet explains the measures that are expected to be put in place to control the effects of noise from the operation of stationary systems designed and installed by the nominated undertaker as part of the Proposed Scheme.