Skip to main page content

Search Results 280

Sort Results by:

  1. Doc

    Phase 2b factsheet: Control of ground-borne noise and vibration

    7th October 2020

    This describes the application of the aims set out in the Noise Policy Statement for England that relate to ground-borne noise and vibration from the operation of both the temporary and permanent railways.

  2. Doc

    Phase 2b factsheet: Control of airborne noise

    7th October 2020

    Outlines the measures that are expected to be put in place to control the effects of airborne noise that might otherwise arise from altered roads and the operational railway during the operation of the Proposed Scheme.

  3. Doc

    Phase 2b factsheet: Management of traffic during construction

    7th October 2020

    This factsheet outlines the emerging framework for the assessment, control and management of matters that will affect the road network during the construction of the Proposed Scheme.

  4. Doc

    Phase 2b factsheet: Ecology

    7th October 2020

    This factsheet sets out the emerging proposals for measures which may be applied to the Proposed Scheme for the purposes of assessing, mitigating and compensating any ecological impacts which may arise in consequence of the Proposed Scheme.

  5. Doc

    Phase 2b factsheet: Control of environmental impacts

    7th October 2020

    This factsheet sets out the emerging proposals for the measures which may be applied to the Proposed Scheme for the purposes of controlling the environmental impacts which may arise from it.

  6. Doc

    Phase 2b factsheet: Working hours

    7th October 2020

    This factsheet outlines the emerging proposals for the working hours for the construction of the Proposed Scheme.

  7. Doc

    Phase 2b factsheet: Draft code of construction practice

    7th October 2020

    This factsheet outlines how it is expected the nominated undertaker will manage the effects of the construction of the Proposed Scheme on communities and the environment through its Code of Construction Practice (CoCP).

  8. Doc

    Phase 2b factsheet: Design

    7th October 2020

    This factsheet outlines the emerging design policy that will be put in place for the Proposed Scheme, which will include aesthetics and quality.

  9. Doc

    Phase 2b factsheet: Construction compounds

    7th October 2020

    Outlines the emerging criteria that would be used to select the location of construction compounds for the Proposed Scheme.

  10. HS2 Exceptional Hardship Scheme and HS2 Need to Sell Scheme: applications statistics

    16th December 2019

    Statistics on applications received for the HS2 Phase One and Phase Two Exceptional Hardship Schemes and the Need to Sell Scheme.