Search Results 311
Sort Results by:
- Date
- Relevance
-
Temporary uses at Euston
5th June 2023
Working through The Euston Partnership (TEP), we are collaborating across partners to develop ideas and identify temporary use projects. The projects being considered will include a mixture of community-led and commercial operator-led.
-
Plans for Maria Fidelis School
5th June 2023
Plans developed by HS2 to create a temporary site office and welfare facility on the former Maria Fidelis school site, on North Gower Street and Starcross Street, were approved by Camden Council in November 2021.
-
Episode Ten: Keeping things clean – our journey to net zero (transcript)
23rd May 2023
This is a transcript of episode ten of HS2’s How to build a railway podcast, first published on 23 May 2023.
-
Streethay Overbridge
10th May 2023
Streethay Overbridge is one of three bridges that will enable HS2 to pass beneath the A38 Rykneld Street, A38 Southbound Slip Road, and the South Staffordshire Line (SSL).
-
HS2 in Old Oak and North Acton
3rd May 2023
This section provides you with information about HS2 works and developments in your area.
-
Euston Portal Headhouse
3rd May 2023
Euston Portal Headhouse and Ventilation Shaft sit on top of the concrete box, where the tunnels connect to the box south of Mornington Street bridge.
-
Euston Cavern Headhouse
3rd May 2023
The Adelaide Road Headhouse is located between Chalk Farm Road and Primrose Hill Road on the Network Rail embankment area.
-
London Logistics Hub
2nd May 2023
Our colossal logistics operation is taking place at HS2’s logistics hub near Willesden Junction.
-
How to build a railway: Episode Seven – Building Bridges (transcript)
25th April 2023
This is a transcript of episode seven of HS2’s How to build a railway podcast, first published on 11 April 2023.