Indirect contracts found 1594
Tier 2 Contractor | Tier 2 Package | Tier 2 Package Value | Contact email for procurement enquiries |
---|---|---|---|
SOCIÉTÉ D'ETUDES ET DE RÉHABILITATION STRUCTURES (S.E.R.S.) | Segment shop drawings booklet | £0m - £1m | [email protected] |
SOCIÉTÉ D'ETUDES ET DE RÉHABILITATION STRUCTURES (S.E.R.S.) | PSV - Complex Temporary Works Design | £0m - £1m | [email protected] |
SOBEN | PQS - Stage 2 | £0m - £1m | [email protected] |
SNF UK | LIW & BROM Coagulant (FLOPAM) Chemicals | £1m - £10m | [email protected] |
SN ENGINEERING | SP700 Lime Silos x 2 | £0m - £1m | [email protected] |
SMT GB | Excavators - Medium | £1m - £10m | [email protected] |
SMT GB | Earthworks Equipment Investment No2 - Wheel Loaders and ADTs | £1m - £10m | [email protected] |
SMT GB | Earthworks Equipment Investment Phase 3: Excavators & ADTs | £1m - £10m | [email protected] |
SMITH'S (GLOUCESTER) | Avonmouth - Rejected Segments | £0m - £1m | |
SMARTA WATER LIMITED | Water | £1m - £10m | [email protected] |
Smart Construction RO Ltd | Concrete repair | £0m - £1m | [email protected] |
SIXENSE MURPHY GEOSPATIAL CONSORTIUM | I&M - Civil Engineering | £10m - £50m | [email protected] [email protected] [email protected] [email protected] |
SIXENSE MURPHY GEOSPATIAL CONSORTIUM | BROT Instrumentation and Monitoring | £10m - £50m | [email protected] [email protected] [email protected] [email protected] |
SIXENSE MURPHY GEOSPATIAL CONSORTIUM | Civil Engineering Permanent Instrumentation and Monitoring | £1m - £10m | [email protected] [email protected] [email protected] [email protected] |
SIXENSE MURPHY GEOSPATIAL CONSORTIUM | I&M - Civil Engineering | £1m - £10m | [email protected] [email protected] [email protected] [email protected] |
SIXENSE MURPHY GEOSPATIAL CONSORTIUM | PERMANENT Civil Engineering Instrumentation and Monitoring | £1m - £10m | [email protected] [email protected] [email protected] [email protected] |
Sixense Ltd | Instrumentation & Monitoring | £1m - £10m | [email protected] |
Sixense Limited | The scope of this package of works is to deliver a trial of InSAR satellite monitoring technology that uses satellite radar imagery to assess movements of individual structures. | £0m - £1m | [email protected] |
Sixense Limited | Monitoring Data Visualisation Platform | £0m - £1m | [email protected] |
SIXENSE | InSar Satellite Monitoring | £0m - £1m | [email protected] |
SIGNWAY SUPPLIES DATCHET | Supply & Installation of Traffic Signs | £0m - £1m | [email protected] [email protected] |
SIG | park hall water bars | £0m - £1m | [email protected] |
Siemens Mobility Limited | The provision of Traffic Control Systems at Creighton Road Corridor | £0m - £1m | [email protected] |
Sibcas Limited | Site set up works | £0m - £1m | [email protected] & [email protected] |
SIBCAS | Site Compounds (Cadent) | £1m - £10m | [email protected] |
SIBCAS | Cadent Compound Purchases | £0m - £1m | [email protected] |
SIBCAS | Warehouse and workshops | £0m - £1m | [email protected] |
SIBCAS | DB Schenker Relocation - Modular Office | £0m - £1m | [email protected] |
SIBCAS | Delta - Coleshill South - Modular Compounds | £0m - £1m | [email protected] |
SIBCAS | Additional Compounds | £0m - £1m | [email protected] |
Sian Formwork Limited | Formwork - Area West | £10m - £50m | [email protected] |
Sian Formwork Limited | Formwork, rebar and concrete works, to include craneage, scaffolding, concrete pumps. | £1m - £10m | [email protected] |
Sian Formwork Limited | FRC - Bridges (Area West) | £1m - £10m | [email protected] |
SIAN FORMWORK | FRC - S2 & S4 | £10m - £50m | [email protected] [email protected] |
SIAN FORMWORK | FRC - S6 | £10m - £50m | [email protected] [email protected] |
SHOTCRETE SERVICES | Bromford East Tunnel Portal Headwall Shotcrete | £0m - £1m | [email protected] |
SHEET PILING UK | Sheet Piling (Temporary) | £1m - £10m | [email protected] |
SHEET PILING UK | SL8.0 Sheet Piling (Temporary & Permanent) | £1m - £10m | [email protected] |
Sheet Piling (UK) Ltd | Temporary sheet piling works to the River Itchen Viaduct | £0m - £1m | [email protected] |
Sheet Piling (UK) Ltd | Steel Sheet Piling | £1m - £10m | [email protected] |
Sheet Piling (UK) Limited | Area East Sheet Piling | £1m - £10m | [email protected] |
SHAY MURTAGH PRECAST | Culverts - All Waterway and Underpass Culverts | £1m - £10m | [email protected] |
SHAY MURTAGH PRECAST | Precast Props and Beams - Package C - UK Standard Beams | £0m - £1m | [email protected] |
SHAY MURTAGH PRECAST | Short Form - Precast Probs and Beams - Package C - UK Standard Beams | £0m - £1m | [email protected] |
SFM (UK) Ltd | Site Security | £0m - £1m | [email protected] |
SFM (UK) Ltd | Provision of FM services to include risk assessments, annual servicing, equipment and general services including firefighting equipment, water, lifts, cleaning etc. Note: The Sub-Contractor is already working on site undertaking security and cleaning services. | £0m - £1m | [email protected] |
Severfield (UK) Ltd | Fabrication, manufacture, and installation of the steel overbridges | £1m - £10m | [email protected] |
Severfield (UK) Ltd | The provision of all necessary mangement, labour, plant, materials, and supervision to carry out fabrication, manufacture, and installation of the steel overbridges | £1m - £10m | [email protected] |
Severfield (UK) Limited | Steelwork (Bridge Beams and Ducts) at Harvil Road Bridge Over Chiltern Line | £0m - £1m | [email protected] |
SEVERFIELD (UK) | Structural Steel - Composite Beams (Package 2.2 - Limited PSC - 3 months) | £0m - £1m | [email protected] |