Indirect contract opportunities
We publish information on key awarded tier 2 subcontracts within our supply chain and encourage interested suppliers to get in touch using the contact details provided.
We also publish details of live and upcoming subcontract procurements to be undertaken by our tier 1 contractors, to provide early visibility of opportunities to the market.
Apply for live indirect contract opportunities on CompeteFor
Downloadable tier 2 awarded contracts AND tier 1 contractor procurement pipeline
Indirect contracts found 1257
Tier 2 Contractor | Tier 2 Package | Tier 2 Package Value | Contact email for procurement enquiries |
---|---|---|---|
127 CONSULTANCIES | Leibherr R924C and accessories for Bromford Intermediate Shaft | £0m - £1m | [email protected] |
3D SCANTECH | Avonmouth - Segment Dimensional Inspection | £0m - £1m | [email protected] |
40 Seven Ltd | Provision of PAS128B utility detection surveys on Section C3 | £0m - £1m | [email protected] |
40SEVEN | Utilities within the Trackway - Track and Trace Survey | £0m - £1m | [email protected] |
AA EURO GROUP | Specialist Skilled Labour LOSC | £1m - £10m | [email protected] [email protected] [email protected] |
ABA SURVEYING | Vehicle-mounted Topographical Mounted Survey | £0m - £1m | [email protected] |
ABBOTT RISK CONSULTING | Hazard Identification and operability study | £0m - £1m | [email protected] |
ABG | WP05 Drainage Geotextile | £1m - £10m | [email protected] |
ABM PRECAST SOLUTIONS | Supply of Precast Concrete Slabs (SL5s) | £1m - £10m | [email protected] |
ABM PRECAST SOLUTIONS | Precast - South Portal / Cromwell Underpass | £1m - £10m | [email protected] |
ABM PRECAST SOLUTIONS | Supply of Precast Culverts (phase 1) | £1m - £10m | [email protected] |
ABM PRECAST SOLUTIONS | Supply of Precast Concrete Slabs (SL2A) | £1m - £10m | [email protected] |
ABM PRECAST SOLUTIONS | Supply of Precast Concrete Slabs (SL7) | £1m - £10m | [email protected] |
ABM PRECAST SOLUTIONS | U Shaped Pre Cast Units- Ashow Road | £0m - £1m | [email protected] |
ABM PRECAST SOLUTIONS | Stoneleigh Precast | £0m - £1m | [email protected] |
ABM PRECAST SOLUTIONS | Precast Concrete DFMA & L Shape Walls | £0m - £1m | [email protected] |
ABM PRECAST SOLUTIONS | Supply of Precast Slabs (SL2B: Mercot Omnia Planks, Crackley Lane Deck & Carol Green BPA Protection) | £0m - £1m | [email protected] |
ABSOLUTE PHOTOGRAPHY | Photography & Videography | £0m - £1m | [email protected] |
Absolute Photography Limited | Provision of Project Progress Photography Consultancy Service to visit all Key EKFB construction sites, as directed by the EKFB Communications Team to document construction progress and the people engaged in the works. | £0m - £1m | [email protected] |
Accelerator Solutions Ltd | Engaging Programme for C23 IPLT | £0m - £1m | [email protected] |
ACCTED | Maintenance Workshops | £1m - £10m | [email protected] |
ACCTED | Bromford East - Filter Press Shed Sheeting | £0m - £1m | [email protected] |
ACE GROUP (ENGINEERING) | Air Compressors - Mobile | £0m - £1m | |
ACIMEX | BROM Avonmouth Segment Lifting Equipment | £0m - £1m | [email protected] |
ACORN GROUP | Ecological mitigation work and site clearance | £0m - £1m | [email protected] |
ACORN GROUP | Site Clearance | £0m - £1m | [email protected] |
ACORN GROUP | Seeding of Stockpiles | £0m - £1m | [email protected] |
ACORN GROUP | Invasive Non-Native Species Removal | £0m - £1m | [email protected] |
ACORN GROUP | Vegetation Maintenance | £0m - £1m | [email protected] |
ACS CIVILS | Early Drainage 2B3 | £0m - £1m | [email protected] |
ACTEMIUM | Precast Yard utilities Design, Supply,Installation and Commissioning | £0m - £1m | [email protected] |
ACTEMIUM | Electrical Installation - Coleshill Rebar Yard | £0m - £1m | [email protected] |
ACTEMIUM | Routewide electrical works for mechanical workshops | £0m - £1m | [email protected] |
Activating Change Ltd | IPT Workshops (Making IPT Work) | £0m - £1m | [email protected] |
Active Training Team Limited | Supply of Professional Services for the Provision of design, production and training services for project Elite inductions | £0m - £1m | [email protected] |
ACTIVE TUNNELLING | Deep Drainage (Micro Tunnelling) | £1m - £10m | [email protected] |
ACTIVE TUNNELLING | C2L Track Drainage (Micro-tunnelling) | £0m - £1m | [email protected] |
ACTIVE TUNNELLING | Tunnelling ECI (SL8.4) WCML | £0m - £1m | [email protected] |
ACTIVE TUNNELLING | Micro Tunnelling 378A UTX | £0m - £1m | [email protected] |
Active Tunnelling Limited | The provision of all management, labour, plant & materials, equipment (including fuel), supervision, access and other resources necessary to properly carry out and complete the Micro tunnelling and associated works as described below including testing and the correction of defects all in accordance with, and as described in, the specifications, drawings and other contract documents. | £1m - £10m | [email protected] |
Adept Contracts Limited | Building and Services Remedials | £0m - £1m | [email protected] |
Adept Contracts Limited | Firestopping (Framework) | £0m - £1m | [email protected] |
Adept Contracts Limited | Firestopping (South Ruislip) - Design and Build | £0m - £1m | [email protected] |
Adept Contracts Limited | Firestopping (Westgate) - Design and Build | £0m - £1m | [email protected] |
Adept Contracts Limited | Noise Insultaion - Mechanical Ventilation (East) | £0m - £1m | [email protected] |
Adept Contracts Limited | Noise Insultation - Forced Ventilation | £0m - £1m | [email protected] |
Adept Contracts Limited | Firestopping (Victoria Road Crossover Box) - Design and Build | £1m - £10m | [email protected] |
AECOM | Supply and installation of Instrumentation for monitoring Network Rail Assets | £1m - £10m | [email protected] |
AECOM | Water Resources & Flood Risk Monitoring | £1m - £10m | [email protected] |
AECOM | Construction Environmental Deliverables | £1m - £10m | [email protected] |