Washwood Heath Depot and Network Integrated Control Centre
The site includes three main buildings: the maintenance building, the Network Integrated Control Centre (NICC) and the cleaners and drivers building. All have been designed to celebrate engineering and provide sustainable working environments with outdoor spaces for staff.
What the buildings do
Maintenance building
The maintenance building is the main hub where we’ll maintain the HS2 train fleet. It includes:
- office space
- workshops
- staff facilities
- storage for materials and equipment
Around 250 staff will work here, including facilities management, fleet management, production, cleaning and depot drivers.
Network Integrated Control Centre
The NICC will oversee the whole HS2 network. This standalone building will manage the operational and control functions for HS2. Over 100 staff will be based here.
Cleaners and drivers building
Located in the west of the depot, this building will house facilities for train servicing teams and driver training. It connects to the stabling yard area, where trains will be cleaned and prepared for passenger service. Around 200 staff will be based here.
Stabling yard
The stabling yard on the west side of the depot is where trains will be parked when not in operation.
Preparing to build the Washwood Heath Depot
We’ve designed dedicated routes for pedestrians and cyclists that will connect with Birmingham’s future transport network. As well as car parks, the depot includes:
- electric vehicle charging points
- cycle and motorcycle parking
- parking for people with limited mobility
- taxi and delivery vehicle drop-off zones