24/7 working to remove water treatment plant at West Ruislip Portal, Hillingdon
Work item: HS2-SCS-25-1586
Work Item Summary
- Project Phase
- Phase 1
- Region
- Hillingdon
- Worksite Name
- West Ruislip
- Contractor
- SCS JV
- Type of works
- Removal of water treatment plant
- Estimated Start Date
- 19/01/2026
- Estimated End Date
- 31/01/2026
What we are doing
From 19 to 31 January 2026, we will remove the water treatment plant located at the West Ruislip Portal site. These works will be 24/7 due to site constraints and the safety of the workforce. There will be lorry movements to remove the equipment during the day only.
We will be emptying the treatment plant used to store water for our tunnel boring machines as it is no longer required. We will do this by using a hose connection into a silt buster system. Once emptied, we will disconnect and disassemble the plant and then remove from site during the day.
You may notice crane movements to lift the equipment for the water treatment plant and disassembly. Due to constraints on site some crane lifting may happen overnight. You may notice lights on site during nights, but we will position lights to avoid shining directly onto nearby properties.
There will be lorry movements from the loading of the plant and containers which will be carried out during the daytime only for offsite transport. You may also hear white noise alarms during the day due to the transportation of equipment.
We will continue to monitor our working methods and noise levels to reduce disruption.