Utilities works on Masons Green Lane

Work item: HS2-EW-SCS-Ph1-Ar-So-S1-UT-1-22/08/23

Work Item Summary

Project Phase
Phase 1
Region
Brent and Ealing, London
Location
A40
Contractor
SCS JV
Type of works
Utility works / surveys
Estimated Start Date
04/09/2023
Estimated End Date
16/09/2023

What we are doing

From 4 September to 9 September 2023 (phase one) and 11 September to 16 September 2023 (phase two) we will be carrying out two ground investigations on Masons Green Lane.

The ground investigations will take place between 8am to 6pm Monday to Friday and 8am to 1pm Saturdays, if required.  We will use noise reducing barriers where possible to help minimise any noise disruption to the local community, working as efficiently as possible whilst keeping our work areas safe and tidy.

The ground investigations will consist of digging a temporary trench to confirm the location of utilities under the surface of the road. The investigations will help us to understand and aid the design of the new railway and the best ways to protect or divert any utilities during construction.