Badminton Close survey work

Work item: HS2-MW-SCS-Ph1-Ar-So-S2-Surv-1-08/02/2023

Work Item Summary

Project Phase
Phase 1
Region
Brent and Ealing, London
Location
Badminton Close
Worksite Name
Mandeville Road
Contractor
SCS JV
Type of works
Utility works / surveys
Estimated Start Date
21/02/2023
Estimated End Date
22/02/2023

What we are doing

In advance of works to create a secondary access road on Badminton Close, we need to carry out a survey on 21 February 2023 to track underground services. The team must work in the highway to carry out detection of the services and lift manhole covers. This work is scheduled to be completed on this one day from 10am to 3pm.

An additional contingency day is allocated for 22 February if more time is needed.

The best way to undertake this (which will minimise the disruption toresidents and safeguard the survey team) would be to  install a full road closure whilst maintaining access for residents. We will put traffic marshals in place to manage any resident vehicle movements through the worksite. No parking suspensions will be in place.