Work item: HS2-EW-SCS-Ph1-Ar-So-S2-Prog-Works-1-06/03/2025

Work Item Summary

Project Phase
Phase 1
Region
Hillingdon, London
Location
Breakspear Road South
Contractor
SCS JV
Type of works
Culvert installation, Road closure
Estimated Start Date
05/04/2025
Estimated End Date
27/04/2025

What we are doing

From 5 to 27 April 2025, we will be carrying out works on Breakspear Road South, under a full 24-hour road closure north and south of the Network Rail bridge.

During the road closure we will:

  • Remove and replace the culvert, including excavating a trench across the road to install the new drainage pipes
  • Cut sheet piles along the area of the HS2 Breakspear Road bridge
  • Install ditches by excavating and by clearing some vegetation and trees

The following traffic management will be in place:

  • A full road closure will in place to ensure that the work can be carried out safely.
  • A clearly signposted diversion route will be in place via Swakeleys Road B467/ High Road B466/ Ickenham Road/ High Street/ Bury Street A4180/ Breakspear Road.
  • Local access to residential properties will be maintained, however, there will be no through access for emergency services.
  • Two weeks of the closure will be within the Easter school holiday from 7 to 21 April 2025.

We would like to apologise for any disruption or inconvenience these works may cause.

For further details please follow the link to the notification below.

Download information relating to these works

Find out more about

If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]