BT Openreach cable installation at North Gower Street

Work item: HS2-MW-SCS-Ph1-Eu-St-S3-UT-24-22/08/2022

Work Item Summary

Project Phase
Phase 1
Region
Camden
Location
Drummond Street, Euston Road, North Gower Street
Contractor
CS JV
Type of works
Cable works
Estimated Start Date
15/08/2022
Estimated End Date
14/12/2022

What we are doing

Cable installation at the junctions with Drummond Street and Euston Road – August and September 2022 (night time works)

During August and September BT Openreach will be installing new cables and jointing these cables to the existing network. These works will take place at night and will not involve noisy working. There will be no excavation. All works will take place via existing BT chambers and manholes. Lane closures will be in place at these locations with traffic still able to access these roads. There will be no disruption to existing supplies during these works.