Emergency Traffic Management on A452 – Marston Green

Work item: HS2-MW-BBV-Ph1-Ar-No-N1-Traf-04-23/01/2024

Work Item Summary

Project Phase
Phase 1
Region
Solihull
Location
Marston Green
Contractor
BBV JV
Type of works
Overnight road closure, Road closure
Estimated Start Date
24/01/2024
Estimated End Date
27/01/2024

What we are doing

A routine inspection has uncovered a defect in a chamber on the link road over the M42 from the new roundabout to the smaller roundabout outside Birmingham Business Park and the NEC. This work is safety critical and as such we are proposing to close the southbound carriageway at 10:30pm on 24 January re-opening at 6am on 25 January to repair the defect. There will then be a lane closure in place on the southbound carriageway from 6am on 25 January until 10:30 pm on 26 January to allow the repairs to cure. A second full closure will be required on from 10:30pm on 26 January until 6am on 27 January to re-instate the tarmac around the chamber. A fully signed diversion via Coleshill Heath Road will be in place.

Download information relating to these works

Find out more about

If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]