Euston Road BT Openreach manhole survey

Work item: N/A

Work Item Summary

Project Phase
Phase 1
Region
Camden, London
Location
Euston Road
Contractor
BT Openreach, Mace Dragados JV
Type of works
Survey
Estimated Start Date
22/08/2022
Estimated End Date
11/09/2022

What we are doing

BT Openreach manhole survey north side of Euston Road (Eastbound)

BT Openreach will be carrying out subsurface surveys of the BT duct route between two manholes on the north side of Euston Road between Melton Street and North Gower Street from late August to early September.

These surveys will help to define the proposed location of Ground Investigation boreholes.  The surveys will take place at night for approximately three nights in order to reduce the impact on pedestrians.  Access will be maintained to the surrounding buildings.

It is not anticipated that these works will be noisy.

 

Find out more about

If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]