Extended working hours at Mandeville Road site

Work item: HS2-EW-SCS-Ph1-Ar-So-S2-Prog-works-34-22/01/2022_01

Work Item Summary

Project Phase
Phase 1
Region
Hillingdon
Location
Mandeville Road
Worksite Name
Mandeville Road
Contractor
SCS JV
Estimated Start Date
11/04/2022
Estimated End Date
30/04/2022

What we are doing

Extended working hours
In order to complete our sheet-piling and undertake essential earthworks at the Mandeville Road site, we will need to work further extended hours between 11 and 30 April. The extended hours will be from 6pm to 8pm on weekdays, with an additional half an hour until 8:30pm on Tuesdays and Thursdays for deliveries using abnormal loads. We will continue to work from 8am to 6pm on Saturdays in this period.
Please click on the following links for previous notifications relating to extended hours at this site:
• https://www.hs2.org.uk/work-items/notice-of-extendedworking-
hours-at-mandeville-road/
• https://www.hs2.org.uk/work-items/notice-of-access-rampconstruction-
work-at-mandeville-road/

Carrying out the work during these extended hours could help reduce the overall duration of construction near people’s properties. We realise that these works are inconvenient to local residents, and we
apologise for the additional inconvenience that these further extended hours will cause. We will do all we can to keep impacts to a minimum, including the measures described on the following page. The site will be closed across the long Bank Holiday weekend of Friday 15 to Monday 18 April 2022.

How these works might affect you
We’re working hard to keep disruption to a minimum by continuing to use a method of piling that generates far less noise and vibration than other methods. We will continue to keep in touch with you
regularly to explain what we’re doing.

During the works, you may notice much larger construction equipment and machinery at our site including heavy goods vehicles, piling, excavating machinery and cranes. We will continue to monitor noise, dust and vibration throughout our works to ensure that we have adequate measures in place to minimise disruption.

We would like to apologise in advance for any disruption or inconvenience this may cause. Every effort is being taken to ensure that these works are carried out in the least impactful way.