Ground Investigation survey north and south of Euston Road
Work item: HS2-MW-MD-Ph1-Eu-St-S3-CR-32-22/06/2022
Work Item Summary
- Project Phase
- Phase 1
- Location
- Euston Road
- Worksite Name
- Euston Station
- Contractor
- Mace Dragados JV
- Type of works
- Utility works / surveys
- Estimated Start Date
- 11/07/2022
- Estimated End Date
- 31/10/2022
What we are doing
Ground Investigation survey north of Euston Road (Eastbound) and south of Euston Road (Southbound)
Mace Dragados will be continuing ground investigations surveys on the north and south of Euston Road until late October 2022.
These surveys will help to inform the design of the tunnels and connections in that area. To reduce the impact on pedestrians the surveys will take place overnight for approximately three nights. Access will be maintained to the surrounding buildings.
We recognise that construction work can be disruptive to those living or working nearby. The nature of our work often means some disturbance is unavoidable, but every effort is made to minimise any unnecessary noise. We will closely monitor all noise, vibration, and dust levels to ensure we do not exceed our agreed limits.