Ground investigation works on the B4118 Birmingham Road , Water Orton

Work item: HS2-MW-Ph1-Ar-No-N2-Traf-2-18/11/2022

Work Item Summary

Project Phase
Phase 1
Region
Warwickshire
Location
Water Orton
Contractor
National Grid
Type of works
Ground investigations
Estimated Start Date
14/12/2022
Estimated End Date
21/12/2022

What we are doing

NGED (National Grid Electrical Distribution) are undertaking non-intrusive ground investigation works along a 700 metre section of the B4118 Birmingham Road. The section along which work will be undertaken is shown in red on the map on page 2. In order to carry out the work safely, traffic management measures (temporary two-way traffic lights) will be in place for the duration of the works. Access to all properties will be maintained at all times.

The work is planned to start on 14 December 2022 and is expected to last until 21 December 2022. All of the works will be undertaken between the hours of 9:30am to 3:30pm each weekday. The temporary traffic lights will be removed outside those hours.