Ground investigations on Mason’s Green Lane footbridge
Work item: HS2-EW-SCS-Ph1-Ar-So-S1-Prog-works-1-18/03/2022
Work Item Summary
- Project Phase
- Phase 1
- Region
- London, Old Oak and North Acton
- Location
- Masons Green Lane, Old Oak
- Contractor
- SCS JV
- Type of works
- Ground investigations
- Estimated Start Date
- 04/04/2022
- Estimated End Date
- 19/04/2022
What we are doing
From 4 April to 19 April 2022, we will be carrying out a series of ground investigations on Masons Green Lane footbridge.
The ground investigations will take place between 8am to 6pm Monday to Friday and 8am to 1pm Saturdays if required.
The footbridge will be closed during the works with a signed pedestrian diversion (approximately a 5–7-minute walk) to guide pedestrians to either side of the footbridge. The area will also be clearly signed.
Your utility services will not be affected during these works.
For further details please see the notification below.