Herlwyn Avenue vegetation clearance for access to Transport for London bridge

Work item: HS2-MW-SCS-Ph1-Ar-So-S2-Veg-40-14/02/2022

Work Item Summary

Project Phase
Phase 1
Region
Hillingdon
Location
South Ruislip
Worksite Name
South Ruislip
Contractor
SCS JV
Type of works
Vegetation clearance
Estimated Start Date
28/02/2022
Estimated End Date
11/03/2022

What we are doing

What we are doing
Ahead of the start of tunnelling later this year, we have been carrying out ground movement assessments to understand the possible impacts of tunnelling. At this location, we need to inspect and carry out minor protection works to the pedestrian footbridge that links to the Transport for London depot.

The trackside area shown on the map overleaf will need to be cleared of brambles and weeds.

Further information is available at https://www.hs2.org.uk/in-your-area/local-community-webpages/hs2-in-hillingdon/tunnelling-works-in-hillingdon/