View route map
Herlwyn Avenue vegetation clearance for access to Transport for London bridge
Work item: HS2-MW-SCS-Ph1-Ar-So-S2-Veg-40-14/02/2022
Work Item Summary
- Project Phase
- Phase 1
- Region
- Hillingdon
- Location
- South Ruislip
- Worksite Name
- South Ruislip
- Contractor
- SCS JV
- Type of works
- Vegetation clearance
- Estimated Start Date
- 28/02/2022
- Estimated End Date
- 11/03/2022
What we are doing
What we are doing
Ahead of the start of tunnelling later this year, we have been carrying out ground movement assessments to understand the possible impacts of tunnelling. At this location, we need to inspect and carry out minor protection works to the pedestrian footbridge that links to the Transport for London depot.
The trackside area shown on the map overleaf will need to be cleared of brambles and weeds.
Further information is available at https://www.hs2.org.uk/in-your-area/local-community-webpages/hs2-in-hillingdon/tunnelling-works-in-hillingdon/
Download information relating to these works
Find out more about
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]