Skip to main page content
View route map

Hoarding works at West Ruislip Tunnel Portal

Work item: HS2-EW-SCS-Ph1-Ar-So-S1-Prog-works-10-30/7/2020

Work Item Summary

Project Phase
Phase 1
Region
Hillingdon
Location
West Ruislip
Contractor
SCS JV
Estimated Start Date
31/08/2020
Estimated End Date
20/12/2021

What we are doing

Update: Activity along the border
Work is continuing to place secure wooden hoarding along the Network Rail border to the south of our work site and then extend it along the southernmost edge of our works. The hoarding will ensure that the work site is both safe and secure. Preparatory works are still taking place during the day, and work on Network Rail land is only taking place at night when trains are not running. This activity is taking longer than expected due to unexpectedly limited number of working hours available next to the railway.

All lights needed for work activity will be placed so that they face away from the residential properties.

The side of the hoarding facing the properties in The Greenway and Hoylake Crescent will be painted dark blue. This colour has been agreed with Network Rail who need to ensure that the red, amber, and green lights are visible to their drivers’ sight lines. here will be a period where we will remove the part of the cutting. This will be done during the day.

Download information relating to these works

If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]