HS2 Works Notification: Daytime road closure, Church Lane, Mixbury

Work item: HS2-MW-EK-Ph1-Ar-Ce-C2-Traf-35-07/04/2022

Work Item Summary

Project Phase
Phase 1
Region
Oxfordshire
Location
Mixbury
Contractor
EKFB JV
Type of works
Road closure, Utility works / surveys
Estimated Start Date
25/07/2022
Estimated End Date
26/07/2022

What we are doing

As part of our preparatory works for the future diversion of a local water mains, we will be carrying out Ground Investigation (GI) works along Church Lane in Mixbury.

Our GI works will involve surveys and trial holes. These activities will allow us to accurately identify the location and condition of the existing water mains that will be diverted while we build HS2.

As we will be conducting these surveys and trial holes very close to the local highway, we will need to close a small section of Church Lane for one day in July.

A section of Church Lane will be fully closed from 8.00am to 6.00pm on Monday 25 July 2022.

Download information relating to these works

Find out more about

If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]