Work item: HS2-MW-EK-Ph1-Ar-Ce-C2-Traf-38-04/05/2022
Work Item Summary
- Project Phase
- Phase 1
- Region
- Oxfordshire
- Location
- Finmere, Mixbury
- Contractor
- EKFB JV
- Type of works
- Haul road construction, Plant crossing, Road closure
- Estimated Start Date
- 20/05/2022
- Estimated End Date
- 25/06/2022
What we are doing
Throughout June, we carried out the installation of a temporary bridge over the A421 to connect our internal road network north and south of the A421.
We have been able to complete the bridge installation ahead of schedule and therefore we can reduce the length of closure required on the A421 this weekend. The closure will now only be between 8am-6pm on Saturday 25 June and open as normal either side of these times. The closure on Saturday will be for the installation of the safety barriers along the carriageway.
There will be a diversion in place for this closure via the A4421 and A43.