What we are doing
Since September 2021 we have been working in the Halse Copse area, this has included installing a site welfare, laydown area, small car park establishment, construction of an access road alongside the Copse for future works and the Halse Copse translocation works.
As work has continued in the area and in the interest of health and safety for users of the highway, we are going to install temporary two-way traffic lights from the work access point onto Welsh Lane (B4525), these will be manually operated and only in use when we have large vehicles entering or leaving the site.
The lights will be installed on the 22 November 2021 until 23 December 2021 (Monday to Friday) and will be operational between the hours of 09:30am and 3.30pm.
The road will open as normal outside of these times.