HS2 Works Notification: Overnight road closures update, A413 London Road

Work item: HS2-MW-EK-Ph1-Ar-Ce-C2-Traf-6-24/05/2022

Work Item Summary

Project Phase
Phase 1
Region
Buckinghamshire
Location
A413
Worksite Name
A413
Contractor
EKFB JV
Type of works
Enabling works, Road closure, Utility works / surveys
Estimated Start Date
03/05/2022
Estimated End Date
16/06/2022

What we are doing

In June, as part of the installation of our conveyor, we will be preparing the ground around the verge of the A413 London Road and installing safety barriers to protect the conveyor.

We will also be lifting a temporary bridge into place over the A413 London Road. This bridge will form a vital part of the conveyor, enabling excavated materials to travel over the A413 as opposed to using the local road network.

We will have team members, large construction machinery and cranes on the A413 carriageway which is why these works will require a full closure.

The A413 London Road overnight closures will take place as follows:
• 8th and 9th June
• 14th, 15th, 16th June – 8pm to 6am

Should there be delays to our works for reasons beyond our control, these dates may be subject to change. We will continue to maintain regular contact with blue light services to keep them updated on our activities.

Download information relating to these works

If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]