HS2 Works Notification: Overnight works, A418, Oxford Road
Work item: HS2-MW-EK-Ph1-Ar-Ce-C2-Prog-works-24-20/06/2022
Work Item Summary
- Project Phase
- Phase 1
- Region
- Buckinghamshire
- Location
- A418
- Contractor
- EKFB JV
- Type of works
- Lane closure, Maintenance work, Utility works / surveys
- Estimated Start Date
- 08/07/2022
- Estimated End Date
- 08/07/2022
What we are doing
In the Spring, we carried out drainage works on the A418 Oxford Road, during these works it was discovered that there was a blockage in the local drain network.
In order to effectively clear this blockage, strong jet washing will be used to flush the local drain system. We apologise in advance as these works are likely to be noisy.
The A418 Oxford Road will have temporary traffic management in the form of a lane closure with multi-phase traffic lights overnight on Friday 8 July 2022, from 10.00pm to 5.00am.
This date may be subject to change, are dependent on weather conditions, ground conditions and other factors outside of our control.