HS2 Works Notification: Road closure, Chetwode
Work item: HS2-MW-EK-Ph1-Ar-Ce-C2-Traf-34-07/04/2022
Work Item Summary
- Project Phase
- Phase 1
- Region
- Buckinghamshire
- Location
- Barton Hartshorn, Chetwode
- Contractor
- EKFB JV
- Type of works
- Road closure, Survey
- Estimated Start Date
- 21/07/2022
- Estimated End Date
- 21/07/2022
What we are doing
In July, we will be carrying out topographical surveys on Barton Hartshorn Road, also known as Stratton Audley Road, Chetwode.
Topographical surveys will help us to finalise the design of the new railway and road alignments and where possible allow us to reinstate features after construction.
These surveys are part of our preparatory works for the School End bridge. Once completed, this bridge will carry traffic over the HS2 rail line.
In order to carry out these surveys safely and effectively, we will need to put in place a daytime road closure with signed diversion. This is required because our staff will be working directly on the carriageway.
Barton Hartshorn Road will be fully closed, from 8.00am to 6.00pm on Thursday 21 July 2022, with a local diversion route in place.
We will work to reopen the roads as soon as possible, to reduce disruption.