HS2 Works Notification: Road closure, Claydon Road near Lower Boddington
Work item: HS2-MW-EK-Ph1-Ar-Ce-C3-Traf-17-21/01/2022
Work Item Summary
- Project Phase
- Phase 1
- Region
- Northamptonshire
- Location
- Boddington, Lower Boddington
- Contractor
- EKFB JV
- Type of works
- Haul road construction, Road closure
- Estimated Start Date
- 07/02/2022
- Estimated End Date
- 23/02/2022
What we are doing
Following on from our preparatory works for our internal haul road we will close a section of Claydon Road, near Lower Boddington for approximately two weeks.
Where our haul road crosses Claydon Road, we will create a strengthened surface using concrete to ensure that we protect the road and any utilities underneath it. It may also be necessary to remove localised areas of vegetation to enable future works to continue and to allow access to areas of our site. An internal haul road will provide a dedicated access route for our heavy construction vehicles and significantly reduce our impacts on the local highway.
As the preparatory works will require large plant and machinery and time for concrete to set, we are required to fully close this section of road, 24 hours per day, until the works are complete. This is for the safety of road users and our staff.
Claydon Road will be fully closed, 24 hours a day, from Monday 7 February to Monday 21 February, with a diversion in place.
We will work to open the roads to reduce disruption as soon as possible.