Work item: HS2-EW-SCS-Ph1-Ar-So-S1Traf-2-27/02/2023

Work Item Summary

Project Phase
Phase 1
Region
London, Old Oak and North Acton
Location
Old Oak
Contractor
SCS JV
Type of works
Monitoring equipment
Estimated Start Date
23/03/2023
Estimated End Date
24/03/2023

What we are doing

On 23 March and 24 March 2023, we will be installing traffic management cameras in four locations in Old Oak Common. The cameras will be installed onto existing lamp columns via a mobile platform from either a bus lane, cycle lane, pedestrian footway, or parking bay (location dependent).

The cameras will help us monitor lorry movements and ensure we keep within the levels agreed with the local authority. The system has been developed to monitor only those vehicles being used for HS2, and no information relating to other road users will be captured. The cameras will be in place for the duration of the HS2 works.

The installations will take place between 8am to 6pm and will take around two hours to complete. We will use noise reducing barriers where possible to help minimise any noise disruption to the local community, working as efficiently as possible whilst keeping our work areas safe and tidy.

How this might affect you

To ensure the safety of the public and our staff, temporary changes will be in place at each installation location, detailed below:

23 March 2023

  • Old Oak Lane – Partial footway closure and parking bay
    temporarily suspended

24 March 2023

  • Old Oak Common Lane (1) – Narrowed lane and a partial
    footway closure
  • Old Oak Common Lane (2) – Narrowed lane and a partial
    footway closure

 