Kerb realignment south side of Euston Road
Work item: HS2-MW-MD-Ph1-Eu-St-S3-CR-32-22/06/2022
Work Item Summary
- Project Phase
- Phase 1
- Region
- Camden
- Location
- Euston Road
- Worksite Name
- Euston Station
- Contractor
- Mace Dragados JV
- Type of works
- Road realignment
- Estimated Start Date
- 21/10/2022
- Estimated End Date
- 31/10/2022
What we are doing
Mace Dragados will be carrying out kerb realignment south side Euston Road from until late October 2022.
These works are part of the relocation of the Interim Taxi Rank required during construction of the proposed HS2 station. Pedestrian access will be maintained throughout the works.
We recognise that construction work can be disruptive to those living or working nearby. The nature of our work often means some disturbance is unavoidable, but every effort is made to minimise any unnecessary noise. We will closely monitor all noise, vibration, and dust levels to ensure we do not exceed our agreed limits.