Work item: HS2-MW-BBVS-Ph1-OOC-St-S4-Traf-17-23/06/2021
Work Item Summary
- Project Phase
- Phase 1
- Region
- Old Oak and North Acton
- Location
- Old Oak
- Contractor
- BBVS JV
- Type of works
- Early construction works
- Estimated Start Date
- 28/06/2021
- Estimated End Date
- 11/07/2021
What we are doing
New site access points off Old Oak Common Lane
From 28 June, during the Network Rail road closure we will be constructing access points to our sites on Wormwood Scrubs. The new access points will all be located on Old Oak Common Lane. We will lower sections of the footpath and install concrete slabs to protect the services in the area. The new access points will allow construction vehicles to access and exit the site compounds on Wormwood Scrubs.
The works will involve a range of machinery including an excavator, vacuum excavator, generator/compressor, trucks for waste material haulage, dumper truck, and concrete trucks. For safety, the works areas will be segregated using mesh fencing.
Traffic Marshalls will be present on both sides of the road closure to help divert pedestrians and manage vehicle movements. We will monitor to ensure that noise does not exceed current permitted levels. In the event of a rise in noise levels, acoustic barriers will be used to reduce the noise.
Download information relating to these works