Night-time lane closure on Breakspear Road South

Work item: HS2-EW-SCS-Ph1-Ar-So-S2-Traf-1-10/11/2023

Work Item Summary

Project Phase
Phase 1
Region
Hillingdon
Location
Breakspear Road South
Worksite Name
West Ruislip
Contractor
SCS JV
Type of works
Utility works / surveys
Estimated Start Date
27/11/2023
Estimated End Date
27/11/2023

What we are doing

What we are doing
On 27 November 2023, we will be carrying out survey works at the Network railway bridge on Breakspear Road South.
We will investigate the condition of the sewer system using a CCTV camera mounted on a small robot. To carry out these works safely, a southbound lane closure will be in place overnight from 10pm to 5am.

We would like to apologise in advance for any disruption or inconvenience this may cause. Every effort is being taken to ensure that these works are carried out in the least impactful way.
We will ensure that disruption is kept to a minimum.