Noise barrier testing at our site on Breakspear Road South

Work item: HS2-MW-SCS-Ph1-Ar-So-S2-Prog-works-4-13/05/2024

Work Item Summary

Project Phase
Phase 1
Region
Hillingdon
Location
Breakspear Road South
Worksite Name
Breakspear Road South
Contractor
SCS JV
Type of works
Noise barrier testing
Estimated Start Date
28/05/2024
Estimated End Date
27/10/2024

What we are doing

From 28 May to 27 October 2024, we will be carrying out noise barrier testing for 24 hours a day, in the area west of the HS2 bridge on Breakspear Road South and north of the Chiltern Rail bridge within our site compound.

A temporary embankment has been constructed in the area where noise barriers have been installed and the structural integrity will be tested.

The scope of the testing is to confirm that the pile foundation and the structure will not have any significant changes due to trains passing the noise barrier.

Download information relating to these works