Noise barrier testing at our site on Breakspear Road South
Work item: HS2-MW-SCS-Ph1-Ar-So-S2-Prog-works-4-13/05/2024
Work Item Summary
- Project Phase
- Phase 1
- Region
- Hillingdon
- Location
- Breakspear Road South
- Worksite Name
- Breakspear Road South
- Contractor
- SCS JV
- Type of works
- Noise barrier testing
- Estimated Start Date
- 28/05/2024
- Estimated End Date
- 27/10/2024
What we are doing
From 28 May to 27 October 2024, we will be carrying out noise barrier testing for 24 hours a day, in the area west of the HS2 bridge on Breakspear Road South and north of the Chiltern Rail bridge within our site compound.
A temporary embankment has been constructed in the area where noise barriers have been installed and the structural integrity will be tested.
The scope of the testing is to confirm that the pile foundation and the structure will not have any significant changes due to trains passing the noise barrier.