Notice of abnormal load deliveries A413 Wendover Green Tunnel
Work item: HS2-EKFB-25-1401
Work Item Summary
- Project Phase
- Phase 1
- Region
- Buckinghamshire
- Location
- A413
- Worksite Name
- Wendover
- Contractor
- EKFB JV
- Type of works
- Large load delivery/collections
- Estimated Start Date
- 14/10/2025
- Estimated End Date
- 15/10/2025
What we are doing
We will have two large tunnel segments delivered along the A413 for the construction of the Wendover Green Tunnel, overnight in mid October. Due to the size of the precast tunnel segments (4.5m in width), they are classed as abnormal loads. These will be delivered to the Wendover bypass.
To safely deliver these tunnel segments, temporary overnight 3 and 2 way traffic management on the A413 will be set up at the Railway bridge and Small Dean Viaduct.
The abnormal loads will be completed overnight from Tuesday 14 October to Wednesday15th October, from 8.30pm to 5.30am.
Associated temporary traffic management, will in place as shown below:
• A413 Railway bridge with 3 way traffic lights
• A413 Small Dean Viaduct with 2 way traffic lights
A delivery is made subject to road and weather conditions.
Download information relating to these works
Find out more about
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]