Notice of bored piling works for the river Pinn overbridge
Work item: HS2-MW-SCS-Ph1-Ar-So-S2-Prog-works-49-12/01/2022
Work Item Summary
- Project Phase
- Phase 1
- Region
- Hillingdon
- Location
- Ruislip
- Worksite Name
- Breakspear Road South
- Contractor
- SCS JV
- Type of works
- Piling
- Estimated Start Date
- 07/02/2022
- Estimated End Date
- 30/04/2022
What we are doing
What we are doing
From 7 February to 30 April 2022, we will be carrying out bored piling works at our site near Breakspear Road South. The area of activity is shown on the map overleaf.
These works are needed to stabilise the ground while we build the river Pinn overbridge. It is an effective approach to combating corrosion and is proven to significantly improve the life expectancy of a structure.
What to expect
There will be heavy goods vehicle movements and deliveries to our site on Breakspear Road South.
You may notice large construction equipment and machinery in our site including heavy goods vehicles, piling and excavating machinery, cranes, lighting towers and concreting equipment.
We anticipate that this piling method will produce minimal vibration and low level noise.