Notice of concrete breaking works at Old Oak Common
Work item: HS2-MW-BBVS-Ph1-OOC-St-S4-Ex-Mat-23-08/04/2022
Work Item Summary
- Project Phase
- Phase 1
- Region
- Old Oak and North Acton
- Location
- Old Oak Common lane
- Worksite Name
- Old Oak Common
- Contractor
- SCS JV
- Type of works
- Construction, Demolition works
- Estimated Start Date
- 06/05/2022
- Estimated End Date
- 30/06/2022
What we are doing
Works at Old Oak Common Site Entrance
As part of the site set-up works at the Old Oak Common station site, we will be creating a new haul road around the site office. This activity will involve intermittent breaking of existing concrete slabs and then laying tarmac. This work is expected to last until the end of June, however if this time period is extended, you will be notified accordingly. The working hours for this activity will take place during our working hours of 8am to 6pm Monday to Friday, and 8am to 1pm Saturday. There will be no noisy works before 9am or after 5pm.
We will be using different excavators to break up and cut through the concrete. A vibratory roller will be used when laying the fresh tarmac onto the newly built road.
Although some noise can be expected from these works, we will be using best practicable means to minimise disruption to nearby residents. This includes the use of acoustic blankets around areas we are breaking the concrete, and a dust suppressant, which will be provided within the working area to minimise the amount of dust generated during the works.