Type of works
Crane installation
Estimated Start Date
24/04/2023
Estimated End Date
05/05/2023

What we are doing

From 24 April until 5 May 2023, we will be installing a platform for a crane in the area next to the site office as shown in the map below. This platform will allow us to use a crane in this area in the future to remove site offices.

To install the platform, we must compact the material we are installing using a vibratory roller machine. This vibration will be noticeable beyond the site boundary.

This work will be undertaken in core hours, Monday to Friday 8am to 6pm and Saturday 8am to 1pm. You may experience increased construction noise and vibration during this period. Noise and vibration monitoring will be in place at all times.

We apologise for any disruption caused by these activities, and we are working to minimise the impacts as far as possible.