Skip to main page content
View route map

Notice of daytime road closure – B4102 Meriden Road

Work item: HS2-EW-BBV-Ph1-Ar-No-N2-Traf-3-03/08/2021

Work Item Summary

Project Phase
Phase 1
Region
Solihull, West Midlands
Location
Hampton in Arden
Contractor
BBV JV
Type of works
Ground investigations, Traffic management
Estimated Start Date
08/03/2021
Estimated End Date
16/03/2021

What we are doing

The work will we be doing

BBV will be carrying out trial hole excavations in the existing verge of the B4102 Meriden Road near to Patrick Farm. This is to identify existing utility services, construct protection slabs over existing utility services and carry out ground condition surveys.

When these works will take place

Works are scheduled from Monday 8 March to Tuesday 16 March excluding Saturday and Sunday. These works are subject to weather conditions.

The road will be closed between 9.30am and 3.30pm each day, pedestrian access will be maintained throughout the closure. There will be advanced warning signs placed on the B4102 Meriden Road and we will also keep you updated through www.hs2insolihull.co.uk . There will be a fully signed diversion in place during the closure – please see map in the downloadable notification.

Download information relating to these works

If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]