Notice of drainage investigations on Hill Lane and Field Way

Work item: HS2-MW-SCS-Ph1-Ar-So-S2-La-Qua-02-21/10/2021

Work Item Summary

Project Phase
Phase 1
Region
Hillingdon
Location
Ruislip
Worksite Name
West Ruislip
Contractor
SCS JV
Type of works
Utility works / surveys
Estimated Start Date
03/11/2021
Estimated End Date
11/11/2021

What we are doing

What we are doing
From 3 to 11 November 2021, we will be carrying out drainage investigations along Hill Lane and Field Way, in the area shown on the map overleaf.

We will be using a CCTV camera mounted on a small robot. Should we find a blockage, we may need to flush the drainage system using a highpressure water jet in order to carry out the investigation. These surveys should not cause any disruption.

In order to carry out these surveys safely, a footpath diversion will be in place and the cycle path will be closed for the duration of these works.  Access to the Hill Lane Playground will be maintained. There will be no disruption to your utility services.

Survey dates
• Hill Lane 3 to 5 November
• Field Way 10 and 11 November