Notice of drainage investigations on Hill Lane and Field Way
Work item: HS2-MW-SCS-Ph1-Ar-So-S2-La-Qua-02-21/10/2021
Work Item Summary
- Project Phase
- Phase 1
- Region
- Hillingdon
- Location
- Ruislip
- Worksite Name
- West Ruislip
- Contractor
- SCS JV
- Type of works
- Utility works / surveys
- Estimated Start Date
- 03/11/2021
- Estimated End Date
- 11/11/2021
What we are doing
What we are doing
From 3 to 11 November 2021, we will be carrying out drainage investigations along Hill Lane and Field Way, in the area shown on the map overleaf.
We will be using a CCTV camera mounted on a small robot. Should we find a blockage, we may need to flush the drainage system using a highpressure water jet in order to carry out the investigation. These surveys should not cause any disruption.
In order to carry out these surveys safely, a footpath diversion will be in place and the cycle path will be closed for the duration of these works. Access to the Hill Lane Playground will be maintained. There will be no disruption to your utility services.
Survey dates
• Hill Lane 3 to 5 November
• Field Way 10 and 11 November
Download information relating to these works
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]