Work item: HS2-MW-EK-Ph1-Ar-Ce-C1-Traf-01-03/01/2024 1MC12-EKF-IN-NTE-CS03-000109

Work Item Summary

Project Phase
Phase 1
Region
Buckinghamshire
Location
Wendover
Worksite Name
Ellesborough Road
Contractor
EKFB JV
Type of works
Road closure
Estimated Start Date
25/03/2024
Estimated End Date
28/03/2024

What we are doing

To complete the final tie-in of the temporary diversion of Ellesborough Road into the existing road, our team need to close the road to enable us to connect the two together and bring it into use.

We will undertake minor works to the road surface, following the removal of pillars that supported electricity cables. We will require a full closure of both alignments of the road, to facilitate this.

Pedestrian and resident access will be maintained throughout the closure although the footpath maybe diverted onto the carriageway.

During the course of these complex realignment works, our team have so far dug trial holes, surveyed, and diverted high voltage cables, gas mains, internet and telephone services and installed a sheet pile wall to protect the Memorial Wood during the Wendover Green Tunnel construction.

When will these works take place?

  • Monday 25 March to Thursday 28 March 2024 (road closures)

Please note, these dates may be subject to change due to circumstances outside of our control but will be completed on or around the timings specified.