Notice of lane closure on Harvil Road
Work item: HS2-EW-SCS-Ph1-Ar-So-S2-UT-1-05/04/2023
Work Item Summary
- Project Phase
- Phase 1
- Region
- Hillingdon
- Location
- Harvil Road
- Worksite Name
- Copthall
- Contractor
- SCS JV
- Type of works
- Lane closure
- Estimated Start Date
- 22/05/2023
- Estimated End Date
- 28/05/2023
What we are doing
What we are doing
From 22 to 28 May 2023, we will be carrying out utility works along Harvil Road, south of the Chiltern Line Railway.
These activities will include drainage surveys and excavation works to connect and install a low hydrant.
In order to carry out these works safely, a lane closure will be in place for the duration of these works between Certas bell mouth and Shorthill Cottage. The location of the work is shown on the map below.
We would like to apologise in advance for any disruption or inconvenience this may cause. Every effort is being taken to ensure that these works are carried out in the least impactful way.
We will ensure that disruption is kept to a minimum.