Notice of night works near Chiltern Line

Work item: HS2-EW-SCS-Ph1-Ar-So-S2-Prog-works-4-01/11/2021

Work Item Summary

Project Phase
Phase 1
Region
Hillingdon
Location
Harvil Road
Contractor
SCS JV
Type of works
Construction
Estimated Start Date
15/02/2021
Estimated End Date
16/04/2021

What we are doing

From the week commencing 25 January 2021, we will carry out sheet piling works next to the Chiltern Line, shown on the map overleaf. This work will help us to support the railway during the excavation works needed for the construction of an overbridge as part of the Harvil Road realignment.

Steel sheet piles will be installed in sequence along the planned perimeter and pressed into position. A piling rig will be used to push the sheets into the ground.

How this work might affect you

A piling rig, cranes and construction machinery will be visible in the area during these works. Due to the location of the sheet piles installation the work will take place during a period where the Chiltern Line has no trains on the tracks for the safety of the operatives and rail users. This being the case the work will take place during the hours shown on the blue panel.