Skip to main page content
View route map

Notice of one night closure of Diddington Lane and daytime traffic management

Work item: HS2-MW-BBV-Ph1-Ar-No-N1-Traf-19-11/04/2023

Work Item Summary

Project Phase
Phase 1
Region
Solihull
Location
Solihull
Contractor
BBV JV
Type of works
Utility works / surveys
Estimated Start Date
27/11/2023
Estimated End Date
28/11/2023

What we are doing

The new railway will approach the A45 on a short embankment and a deep cutting as it heads north from the River Blythe Viaduct. In this area there is an important electricity supply cable that is being carefully diverted so that our work does not interrupt the supply. Overnight on 27 November, our team will be vacuum excavating two pits on either side of the carriageway. This will require the road to be closed between 9:30pm and 6am the following morning. The following day, the team will be pulling and jointing the new cable between the two pits, the road can be open while we do this, but we will have temporary two-way traffic lights in this location for safety reasons. These traffic lights will be in place from 9:30am until 2:30pm on 28 November.

Download information relating to these works

Find out more about

If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]