Notice of overnight closures on A446 Lichfield Road, near Coleshill

Work item: HS2-MW-BBV-Ph1-Ar-No-N1-OTH-4-16/09/2022

Work Item Summary

Project Phase
Phase 1
Region
Warwickshire
Location
Coleshill
Contractor
BBV JV
Type of works
Survey
Estimated Start Date
14/11/2022
Estimated End Date
18/11/2022

What we are doing

The work we will be completing

To inform our design of the future HS2 railway, we need to carry out surveys in the area. These surveys will include taking core samples from various carriageways, CCTV drainage surveys and trial holes. This work is to check connections between the gullies and manholes. To conduct our surveys safely, we will have temporary traffic measures in place, including a diversion route.