Skip to main page content
View route map

Notice of overnight road closure – B4102 Meriden Road

Work item: HS2-EW-BBV-Ph1-Ar-No-N1-Traf-36-04/01/2021

Work Item Summary

Project Phase
Phase 1
Region
Solihull
Location
Hampton in Arden
Contractor
BBV JV
Type of works
Ground investigations, Road closure
Estimated Start Date
03/05/2021
Estimated End Date
12/05/2021

What we are doing

BBV will be carrying out trial hole excavations in the existing verge of the B4102 Meriden Road near to Patrick Farm. This is to identify existing utility services, construct protection slabs over existing utility services and carry out ground condition surveys.

Works are scheduled from Monday 3 May to Wednesday 12 May excluding Saturday and Sunday. These works are subject to weather conditions. The road will be closed between 8.00pm and 8.00am each night, pedestrian access will be maintained throughout the closure.

Download information relating to these works

If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]