View route map
Notice of overnight road closure – B4102 Meriden Road
Work item: HS2-EW-BBV-Ph1-Ar-No-N1-Traf-36-04/01/2021
Work Item Summary
- Project Phase
- Phase 1
- Region
- Solihull
- Location
- Hampton in Arden
- Contractor
- BBV JV
- Type of works
- Ground investigations, Road closure
- Estimated Start Date
- 03/05/2021
- Estimated End Date
- 12/05/2021
What we are doing
BBV will be carrying out trial hole excavations in the existing verge of the B4102 Meriden Road near to Patrick Farm. This is to identify existing utility services, construct protection slabs over existing utility services and carry out ground condition surveys.
Works are scheduled from Monday 3 May to Wednesday 12 May excluding Saturday and Sunday. These works are subject to weather conditions. The road will be closed between 8.00pm and 8.00am each night, pedestrian access will be maintained throughout the closure.
Download information relating to these works
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]