Notice of Road Closure, Hodgetts Lane, Burton Green

Work item: HS2-MW-BBV-Ph1-Ar-No-N1-Traf-8-28/10/2022

Work Item Summary

Project Phase
Phase 1
Region
Warwickshire
Location
Burton Green
Worksite Name
Hodgetts Lane
Contractor
BBV JV
Type of works
Ground investigations
Estimated Start Date
05/12/2022
Estimated End Date
09/12/2022

What we are doing

To facilitate ground investigation (GI) for final design of permanent works, we will be digging trial holes and undertaking survey works on Hodgetts Lane, Burton Green.
GI is the examination and study of the soil, rocks and groundwater below the surface. These GI show information and data about the existing ground conditions, which will enable the new railway to be safely and economically constructed. Trial hole, which is digging of a trial pit or trench, is one of the methods that are used to obtain ground conditions. To carry out these works safely we will be closing a section of Hodgetts Lane.
Hodgetts Lane will be closed from 5 December 2022 to 9 December 2022 between 9am and 3pm and 10 December 2022 8am to 1pm if required, to minimise disruption to peak traffic. A full diversion will be in place. Access to all properties will be maintained.
Our workforce maybe on site one hour before and one hour after to set up and secure our equipment.

Download information relating to these works

Find out more about

If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]