Notice of temporary closure of public rights of way, Bowood Lane, Wendover

Work item: HS2-EKFB-25-1028

Work Item Summary

Project Phase
Phase 1
Region
Buckinghamshire
Location
Bowood Lane, Wendover
Type of works
PRoW Closure
Estimated Start Date
28/04/2025
Estimated End Date
02/04/2025

What we are doing

In April 2025, we opened the Bowood Lane overbridge for pedestrian and cycle access. The diverted public right of ways (PRoW) WEN/37/1 and TLE/3 will no longer be in operation following the opening of the
overbridge. At the end of April, we will be enabling the final layer of tarmac and installing whitelining on the overbridge. For the safety of the public, we will be required to temporarily close the overbridge as a public right of way (PRoW) to complete these works.

• Monday 28 April – Friday 2 May 2025